File #: 19-5491    Version: 1 Name: Construction Contract – Walker Branch Greenway Project
Type: Consent Status: Consent
File created: 5/30/2019 In control: Asset/Facility Management
On agenda: 6/18/2019 Final action:
Title: : Construction Contract - Walker Branch Greenway Project
Attachments: 1. Walker Branch Greenway_Certified Bid Results_Seal_Signed.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title:

Construction Contract - Walker Branch Greenway Project

 

Summary

ACTION:

Award a construction contract to Husky Construction Corp. in the amount of $958,463

 

Staff Contact:                      Brian Bennett, PLA, Project Manager, Asset and Facility Management Department

 

 

Presentation:                      No                                          

 

 

BACKGROUND/JUSTIFICATION:

This contract is for the construction of the Walker Branch Greenway, which is located in southwest Mecklenburg County, near the intersection of Highway 49 (S. Tryon) and Highway 160 (Steele Creek Road). The project includes 0.7 miles of new greenway construction, extending the existing Walker Branch Greenway to Smith Road. The project will include a 12-foot wide asphalt trail, a neighborhood connection to Walker Creek Drive, two overlooks, a pedestrian bridge, as well as a small connection to the Steele Creek Athletic Association.  As part of this project the existing Walker Branch Greenway will be repaved.

 

 

PROCUREMENT BACKGROUND:

On April 18, 2019, Mecklenburg County Asset and Facility Management advertised the project in the Charlotte Observer, the Charlotte Post, the Greater Diversity News, and the State Interactive Purchasing website. The documents were also available for viewing at the Mecklenburg County M/W/SBE office, Metrolina Minority Contractors Association, the Hispanic Contractors Association of the Carolinas, the Charlotte Association of General Contractors, and Dodge Data & Analytics. A pre-bid meeting was held on April 25, 2019. Six (6) valid, single prime, unit cost bids were received on May 14, 2019 for the greenway construction work. Husky Construction Corp. was the low bidder in the amount of $958,463.

 

Attachment: Bid Tabulation

 

Anticipated M/W/SBE Utilization:

                     Prime Contractor                      MBE 0%                     WBE 0%                     SBE 78.1%

                     Sub Contractors                     MBE 7.3%                     WBE 3.1%                     SBE 11.5%

 

 

POLICY IMPACT:

N/A

 

 

FISCAL IMPACT:

Funds are available from PayGo ($958,463)