File #: 24-0432    Version: 3 Name: Construction Contract - Albemarle Road Park
Type: Consent Status: Consent
File created: 7/16/2024 In control: Asset/Facility Management
On agenda: 8/7/2024 Final action:
Title: Construction Contract - Albemarle Road Park
Attachments: 1. Certified Bid Tab - Albemarle Road Park
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title
Construction Contract - Albemarle Road Park

Action
ACTION:
Award a construction contract to J. D. Goodrum Co., Inc. in the amount of $837,000.00


Staff Contact: Karen Weston-Chien, Project Manager, Asset and Facility Management



Presentation: No


BACKGROUND/JUSTIFICATION:
This construction contract will include renovations to the existing Albemarle Road Park located at 9120 W.T. Harris Boulevard. Work includes renovations to the existing park, as well as the addition of an extensive path system that includes a new bridge that joins two portions of the site. This path system also provides connections to Albemarle Road Elementary and the intersection of Idlewild Road and Harris Boulevard.



PROCUREMENT BACKGROUND:
The project was advertised on March 21, 2024, in the Charlotte Observer, the Charlotte Post, and the NC eProcurement website. The documents were also available for viewing at the Mecklenburg County BDI office, Metrolina Minority Contractors Association, and the Hispanic Contractors Association of the Carolinas. A pre-bid meeting was held on March 27, 2024. The bid opening was held on April 16, 2024. A total of four (4) bids were received and opened. J. D. Goodrum Co., Inc. was the low bidder with a total bid in the amount of $1,139,996.00. This figure includes the base bid and contingency. No add alternates were accepted.
Because the low bid was over budget, staff negotiated with the low bidder for a final contract amount of $837,000.00 to bring the project within budget.

Attachment: Certified Bid Tabulation

Anticipated MWBE Utilization: 6.13%
Sub-Contractors MWBE Goals: MBE 4% WBE 2%

Prime Contractor Utilization: MBE 0% WBE 0%
Sub-Contractors Utilization: MBE 4.08% WBE 2.05%
J. D. Goodrum Co., Inc. intends to self-perform work with their own forces, or subcontract with non-MWBE subcontractors for 93.87% of the work. The remaining 6.13% of the total work is being subcontracted with MWBE subcontractors at the following partic...